APCO developing the first oil shale mine-mouth power plant of 2 277 MW in Jordan

المعلن عن الوظيفة : - نقابة المهندسين الأردنيين
تم الإعلان               :- 2019-04-07

APCO is developing the first oil shale mine-mouth power plant of 2 277 MW in Jordan . This project leads the oil shale revolution an creates long term energy security to the Kingdome of Jordan. The O&M Company (OMCO ) of the Project is looking for new Jordanian talents who has the passion to take up the challenge. Location : Attarat m Ghurdan Area , 110 Km to the south -esat of Amman ( Accommodation is provided for shift personnel) . Qualified candidates are kindly requested to apply using the link besides the job title. Position Link to Apply Control & Instrumentation Engineer https://bit.ly/2ODGCaX Section Head Turbine & Balance of Plant https://bit.ly/2uKyVXD Section Head Performance https://bit.ly/2JPtYXx Section Head Electrical https://bit.ly/2FQLcPp Section Head Material Handling Operation https://bit.ly/2K9D41R Section Head Maintenance Planning and Condition Monitoring https://bit.ly/2HNSNRZ Operations Engineer https://bit.ly/2JWibXx Steam Turbine & Balance of Plant Engineer https://bit.ly/2YEzoIi CFBC Boilers & Auxiliary Engineer https://bit.ly/2YMo7WG Maintenance Planning / Condition Monitoring Engineer https://bit.ly/2VbeG0K Procurement Officer https://bit.ly/2CAgZDh Power Plant Chemistry Lab Assistant( Water) / ( Oil Shale) https://bit.ly/2Vazmpq Shift Charge Engineer https://bit.ly/2uMqmvr Training Engineer https://bit.ly/2I6W7ab

حالة الوظيفة (يرجى تسجيل الدخول للتقدم للوظيفة)
        عدد المتقدمين للوظيفة 0
  • 1644 تمت المشاهدة
التخصصات الرئيسية التخصصات الفرعية